COMPLETED PROJECTS
INFRASTRUCTURE PROJECTS
Esenler Cin Cin Brook Rehabilitation First Part
Istanbul Anatolian Side 1. Part River, Storm water, Wastewater, Maintenance and the Cleaning Constructions.
Wastewater and Storm Channel Construction at Kadikoy-Maltepe Regions
Water Channel Construction and Repairing Works at Besiktas
River Cleaning Works Kurbaglıdere, Kadıkoy
3rd Division Sewerage Network Construction at Beyoglu
Road and Channel Construction at Ataturk Street, Maltepe and E-5 Junction at Pendik Districts
Land Side Wall Construction at Haramidere and Various Art Works at Topkapı
Road and Channel Construction at The 9th Road Esenler, Bakırkoy
2nd Division of the Unique Road and Channel Construction
Road and Sewerage Construction at Emirhan Street, Besiktas / ISTANBUL
4th Division Channel Construction in Uskudar
4th Division Road and Sewerage Construction in Beyoglu 
Collecting Solid Waste from Houses and Road Cleaning Work in Municipally Region
3rd Division Road and Sewerage Construction in Beyoglu 
2nd Division Road and Sewerage Construction in Beyoglu
1st Division Road and Sewerage Construction in Beyoglu
Sisli District 2nd Division Road and Channel Construction 
ROAD & TRANSPORTATION PROJECTS
Road Construction at Ataturk, Inonu, and Bayar Streets (Old Uskudar and Yelken Degirmeni Streets)
Road Repairing at the Asian Side of Istanbul
Road Repairing at the European Side of Istanbul
Main Artery Road Construction at Dudullu - Icerenkoy Bostancı Line
Reconstruction of the Road and Broken Down Retaining Wall at Emirgan - Istinye Way
Road Construction and Wall Repairing at Zincirlikuyu Cemetery Sisli
1st Division Pedestrian Way Arrangement Construction at Istiklal Street Beyoglu
Preferred Bus Way Construction between Feyzipasa Boulevard and Ataturk Boulevard 
Road and Channel Construction at Ataturk Street, Maltepe and E-5 Junction at Pendik districts
Asphalt Repairing Work in the 12th Branch of Turkish Road Administrative
Asphalt Repairing Work around the 12th Branch of Turkish Road Administrative
Road and Channel Construction at the 9th Road Esenler
Art Structures at Selimpasa Junction, Kinali Junction, and Separated Road Construction.
Road and Sewerage Channel Construction at Emirhan street, Besiktas
1st group Road Construction at Seyrantepe, Yesilce Industry Park and Kustepe Districts
3rd group Road Construction at Izzetpasa, Celiktepe and 19 Mayis Districts
4th Group Road Construction at Gursel District
Chief Engineering Work in Highway and Expressway Construction and Various Works in Art Structures in the West Junction of Izmit
Hydraulic Art Structure and Wall Construction for Highway and Expressway
Various Restoration Works and Art Structure Constructions of 14th Branch.
Various Restoration Works for Art Structures of 14th Branch