Administration Water, Channel and Storm Channel Construction, Repairing, Rehabilitation Works at Kartal 


Location: Istanbul
Project Completion Date: Continue
Client: Istanbul Water and Wastewater Management
Project Description:
21.667 m long with the diameters between Ø 300-600 mm concrete wastewater pipe construction, 2.746 m long with the diameters between Ø 300-600 mm wastewater HDPE pipe construction, 2.850 m in long with the diameter of Ø 200 wastewater residential connections constructed ,100.000 m³ waste sucked by sewage truck, 4.980 times clogged wastewater channels cleared, 11.800 times clogged residential connections cleared, 9.050 m long with the diameters between Ø100-300 mm ductile font pipes laid out, 300.000 m long storm water and wastewater channel inspection with CCTV, 300.000 m long storm water and wastewater channel cleaning with combine vehicle, 2.930 m long with the diameters of Ø 200-600 pipe line partial rehabilitation. 5.075 m long with diameters Ø 300-600 trenchless concrete pipe supply, replacement or lay down, 5.600 m long with diameters Ø 125-355 HDPE pipe supply, replacement or lay down.