4th Section of Anatolian Side Pipe Jacking Construction


Location: İstanbul
Project Completion Date: Continue
Client: Istanbul Water and Wastewater Management
Project Description:
3.500 m long with the diameters between Ø 300-1.000 mm concrete wastewater pipe construction, 5.000 m long with the diameter Ø1.400 mm pipe micro tunneling and pipe jacking construction.