Road and Channel Construction at Ataturk Street, Maltepe and E-5 Junction at Pendik Districts


Location: Istanbul
Project Completion Date: 07.12.1989
Client: Istanbul Metropolitan Municipality 

Project Description:
6.000 m in length with the diameters between Ų 300 - 600 mm concrete storm and wastewater pipes laid out. Over them road and the sidewalks construction completed.