Road and Sewerage Construction at Emirhan Street, Besiktas / ISTANBUL


Location: Istanbul
Project Completion Date: 28.10.1988
Client: Istanbul Metropolitan Municipality 


Project Description:
7.000 m in length of road, sideways, and the diameter between Ų 300 and  Ų 400 mm of wastewater and storm water constructed.